亚洲av激情五区,天堂AV资源在线观看,1769一区二区三区,久久99专区,日韩熟女人妻中文在线,69视频精品,操欧美日韩中文,日韩操逼无码免费观看,中文字幕在线日韩视频

Welcome to visitKunshan Tehui Plastic Mould Co., Ltd. official website!

Chinese| English| Japanese| Favorite/ Contact

0512-57628580

ewm
Contact us
Contact

Kunshan Tehui Plastic Mould Co., Ltd.
Contacts:Mr Bai
Tel:(86) 0512-57628580/50335774

Fax:(86) 0512-36809928

E-mail:tehui2011@163.com
Site:www.hongtaish.cn

Add:China:2838 Huanqing Road, Kunshan City, Jiangsu Province

Company news

Current location:Home --> Company news

Measures for improving the welding seam of plastic mold production

Author: ComeFrom: Date:2017/7/18 9:42:18 Hits:4103
In the injection molding plant in the injection of new technology often have a lot, and in the injection molding processing of the reasons for the weld, plastic products, the weld is the injection process from different directions of the molten resin in the junction can not be fully integrated and produced. Plastic mold production of plastic injection process due to the two resin flow at the fusion will not be mixed with each other; therefore, the lower the temperature, the more obvious the fusion marks, and the strength will be reduced. On the contrary, the higher the temperature, the adhesion will be enhanced. The bonding condition at the fusion point also depends on the pressure applied thereto. The lower the production pressure of plastic mold production, the worse the fusion, the lower the strength. The fusion is the confluence of the resin, and it may also be the flow tip of the flow tip, and if the gas is not provided in the position of the weld, it is possible to deteriorate the appearance and strength of the fusion.


Improvements:
L) plastic mold production to improve the resin temperature, improve the mold temperature, increase the injection pressure and speed;
2) Note that the exhaust of the parting surface increases the insert at the point where the weld is generated. The thimble is also ventilated.
3) choose a reasonable position into the plastic, plastic products before the mold is best to do mold flow analysis;
4) increase the process of waste material discharge material, forming and then cut off to be removed.
5) as much as possible to shorten the runner system to improve the go glue;
6) Matte products can try to choose coarse lines, which also help to improve the weld marks.
Contacts:Mr Bai   Tel: (86) 0512-57628580?50335774  
Fax: (86) 0512-36809928  E-mail: :tehui2011@163.com  Site:www.hongtaish.cn
Add.: 2838 Huanqing Road, Kunshan City

Copyright:Kunshan Tehui Plastic Mould Co., Ltd.  Technical Support:KSJINCHENG
Sweep, more exciting!
南投县| 体育| 嘉荫县| 定远县| 牙克石市| 锡林浩特市| 利辛县| 平乡县| 汉阴县| 濮阳市| 达拉特旗| 边坝县| 霍山县| 舟曲县| 南召县| 孟村| 开封县| 屏东县| 安庆市| 延长县| 杭锦后旗| 泸西县| 苏尼特左旗| 剑河县| 安新县| 修水县| 重庆市| 邢台县| 沂水县| 文山县| 都安| 海盐县| 安化县| 比如县| 宁河县| 北安市| 莱阳市| 花垣县| 遵义市| 嘉黎县| 治多县|