亚洲av激情五区,天堂AV资源在线观看,1769一区二区三区,久久99专区,日韩熟女人妻中文在线,69视频精品,操欧美日韩中文,日韩操逼无码免费观看,中文字幕在线日韩视频

Welcome to visitKunshan Tehui Plastic Mould Co., Ltd. official website!

Chinese| English| Japanese| Favorite/ Contact

0512-57628580

ewm
Contact us
Contact

Kunshan Tehui Plastic Mould Co., Ltd.
Contacts:Mr Bai
Tel:(86) 0512-57628580/50335774

Fax:(86) 0512-36809928

E-mail:tehui2011@163.com
Site:www.hongtaish.cn

Add:China:2838 Huanqing Road, Kunshan City, Jiangsu Province

Company news

Current location:Home --> Company news

What should the plastic mold assembly diagram include?

Author: ComeFrom: Date:2017/7/17 15:16:22 Hits:4603
1. Mold forming part of the structure
2. The structure of the pouring system and the exhaust system.
3. Parting and sub-mode pickup mode.
4. Outline structure and all connections, positioning, orientation of the guide.
5. Mark the height of the cavity (not required, as required) and the overall size of the mold.
6. Auxiliary tools (pickup tools, correction tools, etc.).
7. Order all parts in sequence, and fill in the schedule.
8. Mark technical requirements and instructions.
Previous:Nothing
Contacts:Mr Bai   Tel: (86) 0512-57628580?50335774  
Fax: (86) 0512-36809928  E-mail: :tehui2011@163.com  Site:www.hongtaish.cn
Add.: 2838 Huanqing Road, Kunshan City

Copyright:Kunshan Tehui Plastic Mould Co., Ltd.  Technical Support:KSJINCHENG
Sweep, more exciting!
宜兰市| 双辽市| 上饶县| 潜江市| 株洲县| 临沭县| 磐安县| 库伦旗| 库车县| 小金县| 寻乌县| 平泉县| 望谟县| 玉山县| 山西省| 香格里拉县| 尖扎县| 沈丘县| 大安市| 稻城县| 七台河市| 陇西县| 长垣县| 多伦县| 丽江市| 鹰潭市| 民勤县| 南陵县| 雷波县| 正镶白旗| 马龙县| 赤城县| 开封市| 永靖县| 宿州市| 清镇市| 山阴县| 太和县| 定安县| 江城| 静安区|